![]() Sudden temperature changes can cause condensation to form inside ZDLRA Rack. You could damage the system board if you force your fingers into the gap rather than using a flathead screwdriver.ĭo not place anything on top of ZDLRA Rack or perform any work directly above the rack.ĭo not let the room temperature rise sharply, especially in winter. If you cannot reach the connector lock when disconnecting LAN cables, then press the connector lock with a flathead screwdriver to disconnect the cable. Also be sure to observe the precautions, warnings, and notes about handling that appear on labels on the equipment.ĭo not place cables under the equipment or stretch the cables too tightly.ĭo not disconnect power cords from the equipment while its power is on. Ensure that your facility administrator or a qualified electrical engineer verifies the grounding method for the building, and performs the grounding work.īe sure that each grounding wire used for ZDLRA Rack is used exclusively for ZDLRA Rack. When using shared grounding, the grounding resistance must not be greater than 10 ohms. Use a power outlet that uses proper grounding. Install ZDLRA Rack on a flat, level surface. Before ZDLRA Rack arrives, the following safety precautions should be reviewed to ensure the site is safe, as well as ready for delivery.įailing to observe these precautions can result in injury, equipment damage, or malfunction.ĭo not install ZDLRA Rack in a location that is exposed to direct sunlight or near a device that may become hot.ĭo not install ZDLRA Rack in a location that is exposed to excessive dust, corrosive gases, or air with high salt concentrations.ĭo not install ZDLRA Rack in a location that is exposed to frequent vibrations.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |